PLANS FOR 2016

IMPLEMENTATION OF MAJOR PROJECTS

  • Novy Port: Launch of the Gates of the Arctic offshore offloading terminal; use of new technologies as part of a hydraulic fracturing programme; start of full-scale production and oil shipments. Read more
  • Prirazlomnoye: completion of the well construction programme (opening of 1 injection and 3 production wells) for a more than two-fold increase in oil production; implementation of a programme to phase out imports of foreign equipment for offshore ice-resistant fixed platform
  • Messoyakha: supplying the first batch of oil to the trunk oil pipeline system; construction and installation of basic infrastructure; obtaining a custom duty exemption

  • Kuyumba: supply the first batch of oil to the trunk oil pipeline system; obtaining a customs duty exemption
  • Badra: commissioning of 4 wells; commissioning of the third petroleum stage and priority infrastructure buildings of the Central Gathering Facility
  • Kurdistan: completion of the process of transferring operatorship from Western Zagros for the Garmian Block; completion of a range of geological exploration work at the Shakal Block

PRODUCTION AT MATURE FIELDS

  • Development of mature fields “Gazpromneft - Khantos”, “Gazpromneft - Noyabrskneftegaz”, “Gazpromneft - East” by acquisition of licenses, production at “Gazprom neft Orenburg”
  • Continuing drilling at Priobskoye field

REFINING

  • Modernising primary oil refinery complexes at the Omsk and Moscow Oil Refineries
  • Omsk Refinery: the continued implementation of the project to create the production of modern cracking catalysts and hydroprocessing; construction and commissioning of the zeolite stabilization unit and fleet of liquefied gases